Custom Shower Door In Place & Painting on First Floor Begins

The frameless glass door was installed in the master shower a couple of weeks back.

IMG 0213

Master bath vanity awaiting plumber

IMG 0212

We decided to hire professional painters for the first floor, stair area, and upstairs hallway to alleviate a time crunch with the holidays upon us

IMG 0214IMG 0215IMG 0216

The house has come a long way since this last picture. Most things are done and cleaning has started. More pics to come after I take some more. Move in will take place in the next couple of weekends.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>